Our Professional Installation Process

A structured installation workflow for decorative mouldings, cornices, skirting boards, 3D wall panels and indirect lighting projects.

Briefing

We start by understanding the project: country, property type, rooms involved, services required, design intent, expected finish and timeline.

01

Plans / Measurements

You can send architectural drawings, wall elevations, room measurements, photos, profile references or design briefs. These documents help us review the scope and complexity of the installation.

02

Product Coordination

For projects involving Orac Decor products, Orac Decor-style systems or other decorative profiles, the selected materials must be checked against the installation requirements, room conditions and desired finish.

03

Surface Preparation

Before installation, the surfaces, walls, ceilings and transitions must be reviewed. Correct preparation helps ensure better alignment, stronger fixing and cleaner finishing.

04

Installation

Profiles, panels or LED coving are installed with attention to layout, cuts, joints, corners, long runs and visual consistency.

05

Finishing

The final result depends on the details: joints, edges, gaps, transitions and preparation for painting or final decoration.

06

Handover

Once the installation is complete, the work is reviewed so the project can continue with painting, lighting completion or final interior finishes.

07

International Coordination

Faura supports project enquiries in Switzerland, Germany and France. For international projects, clear documentation, images, plans and timelines help make quoting and coordination more efficient.

08